2023-24 Important School Information

Arrival - doors will be open at 7:15

K-1st grade students 7:15-7:23 report to Mrs. Stoltz room

2-3 grade students 7:15-7:23 report to Cafeteria

4-5 grade students 7:15-7:23 report to Gymnasium

Class begins at 7:30

Morning Announcements at 7:40

Free Breakfast and Lunch

Fraser Valley Elementary is participating in the Healthy School Free Lunch program.  ALL FVE students will receive 1 free breakfast and 1 free lunch daily.  Staff and Guests will be charged 3.75 for breakfast and 5.00 for lunch.

Dismissal 3:33

Parking will be limited due to construction. We ask all parents to pick up from their vehicle in the following areas of the oldest child to keep the line moving. (look for signs first two weeks)

2nd Grade in front of school closest to the bus barn

1st grade in front of school near cafeteria exit

Kindergarten in front of school near flag pole

Preschool in front of main entrance

3rd Grade closest to stop sign along main parking exit loop

4th and 5th Grades pick up in the bus loop area (parents don’t enter parking lot but line up along street)

* Please make sure the office is notified of any after school plan changes or special arrangements 970-726-8033 by 3:00pm., notifying the student or teacher doesn’t help and causes confusion to the dismissal system. It can be very difficult to get 260 students going in the appropriate direction from 3:20-3:40 daily with rec. programs, bus connections, parent pick up and walking/ friend arrangements.

Free Breakfast and Lunch

Fraser Valley Elementary is participating in the Healthy School Free Lunch program.  ALL FVE students will receive 1 free breakfast and 1 free lunch daily.  Staff and Guests will be charged 3.75 for breakfast and 5.00 for lunch.

New Student Information System

East Grand School District is improving our student data management system from PowerSchool to ALMA.  We were able to transfer existing student information into ALMA but we are asking all parents to confirm the accuracy of the information.

You will find links to access each school's Alma instance on our District Website. Please watch the provided videos explaining our new registration process, links for these videos are also available on our District Website.

Building Construction Information

Construction on the FVE remodel/ addition work has begun and will continue for the next 12 months.  We have been working closely with the construction company to make sure our site is safe and the impact on learning will be minimized.

We have had some significant successes and setbacks with pre-existing conditions and water leaks challenging our scope of work. We have a new roof over the oldest part of the building, new windows in the oldest part of the building, a new floor in the cafeteria, some new sidewalks and 22 new interactive display boards for each classroom.